Commercial New Build Equipment Power
Electrical infrastructure planned around the equipment before concrete is poured, walls are closed, and the building is energized.
On Target Contracting provides equipment power for new commercial construction throughout the Phoenix metro area.
In a new build, equipment power should be planned before the equipment arrives onsite.
HVAC systems, commercial kitchens, manufacturing equipment, pumps, motors, refrigeration, chargers, and specialty systems may all require different voltages, phases, circuit sizes, feeders, disconnects, and distribution equipment.
OTC coordinates those requirements with the electrical plans, equipment schedules, approved submittals, and actual equipment locations so the building is ready when the equipment is installed.
Start With the Equipment Schedule
The electrical system should be built around the equipment that will actually be installed.
OTC reviews information such as:
-
Equipment voltage
-
Amperage
-
Phase
-
Horsepower
-
MCA and MOCP where applicable
-
Disconnect requirements
-
Manufacturer instructions
-
Final equipment location
For larger equipment, approved cut sheets and submittals should be reviewed before rough-in whenever possible.
Dedicated Equipment Circuits
New commercial buildings may require dedicated power for equipment such as:
-
HVAC units
-
Commercial kitchen equipment
-
Refrigeration
-
Pumps
-
Motors
-
Compressors
-
Manufacturing machinery
-
Conveyors
-
Chargers
-
Specialty equipment
OTC sizes the circuit around the actual equipment requirements rather than simply installing a standard circuit near the equipment location.
Three-Phase Equipment
Many larger commercial loads operate from three-phase power.
Depending on the project, equipment may require:
-
208V three-phase
-
480V three-phase
-
208Y/120V distribution
-
480Y/277V distribution
Not every piece of equipment is three-phase, and not every commercial building uses the same distribution voltage.
OTC verifies the equipment requirements against the building's electrical design before installation.
Feeders & Local Distribution
Larger equipment may require more than a standard branch circuit.
The installation may include:
-
Dedicated feeder
-
Larger conduit
-
Equipment disconnect
-
Local panel
-
Transformer
-
Distribution panel
-
Motor-related equipment
For facilities with multiple large loads, placing distribution closer to the equipment can provide a cleaner system than running every circuit back to the main electrical room.
Transformers
New construction may use transformers when the building distribution voltage does not match the equipment or local branch-circuit requirements.
A common commercial arrangement is:
480V Distribution → Transformer → 208Y/120V Panel → Equipment & Branch Loads
OTC coordinates the transformer, primary feeder, secondary distribution, grounding, and downstream equipment as part of the complete system.
Equipment Disconnects
Many pieces of commercial equipment require a local disconnecting means.
OTC installs and coordinates disconnects for equipment such as:
-
HVAC
-
Motors
-
Pumps
-
Compressors
-
Kitchen equipment
-
Machinery
-
Specialty systems
The disconnect location should work with both the electrical requirements and the final equipment layout.
Coordinate Before Concrete & Walls
New construction gives the project an opportunity that remodel work does not:
We can plan the electrical path before the building gets in the way.
Equipment-power requirements may affect:
-
Underground conduit
-
Slab penetrations
-
Equipment pads
-
Wall rough-in
-
Ceiling pathways
-
Electrical-room layout
-
Feeder routing
A missed equipment requirement during underground or rough-in can become significantly more expensive after concrete is poured and finishes are installed.
Final Equipment Locations Matter
A circuit can be correctly sized and still be installed in the wrong place.
OTC coordinates equipment power with:
-
Architectural plans
-
Mechanical plans
-
Kitchen equipment plans
-
Structural conditions
-
Vendor submittals
-
Final equipment layouts
The goal is to have the disconnect, connection point, and required power where the equipment actually lands.
Verify Equipment Changes During Construction
Equipment frequently changes after the original construction documents are issued.
A substituted piece of equipment may have a different:
-
Voltage
-
Amperage
-
Phase
-
Connection type
-
Disconnect requirement
Those changes can affect the electrical scope.
OTC reviews updated equipment information during construction so changes are identified before final connection whenever possible.
Plan the Electrical Capacity Early
Large equipment loads need to be considered as part of the building's overall electrical design.
A facility with significant:
-
Commercial kitchen loads
-
Manufacturing equipment
-
Large HVAC systems
-
Refrigeration
-
Motors
-
Charging equipment
may require larger panels, transformers, switchgear, or service capacity.
For major new-build distribution, OTC works from the engineered electrical design and coordinates the construction around the approved load calculations and equipment requirements.
Future Equipment
When practical, new construction should consider reasonable future growth.
That may include:
-
Spare breaker space
-
Additional conduit pathways
-
Distribution capacity
-
Space for future equipment
-
Accessible electrical rooms
The goal is not to oversize the building unnecessarily.
It is to avoid creating a brand-new electrical system that immediately becomes difficult to expand.
From Underground to Final Connection
A complete new-build equipment-power scope may include:
-
Equipment schedule review
-
Underground conduit
-
Feeders
-
Panels and subpanels
-
Transformers
-
Dedicated circuits
-
Disconnects
-
Three-phase power
-
Equipment connections
-
HVAC power
-
Kitchen equipment power
-
Machinery power
-
Testing
-
Labeling
-
Final verification
OTC coordinates the equipment power from the early construction stages through final startup.
Building a Commercial Facility With Specialized Equipment?
Send OTC the electrical plans, equipment schedules, approved submittals, and equipment cut sheets. We can coordinate the power requirements early, identify voltage and distribution needs, and install the feeders, circuits, transformers, disconnects, and final connections required to support the equipment. Plan the power before the equipment arrives—not after the building is finished.