Service Entrance Switchgear & Main Distribution
Commercial service equipment and main power distribution coordinated from the utility connection through switchgear, transformers, feeders, and downstream electrical systems.
On Target Contracting installs and coordinates commercial service entrance equipment, switchgear, switchboards, metering, and main electrical distribution for new commercial construction throughout the Phoenix metro area.
This is where the building's electrical system begins.
Utility power has to transition into service equipment capable of safely receiving, protecting, and distributing power throughout the facility.
Depending on the project, that can include utility service conduits, metering, service entrance switchgear, switchboards, main disconnects, distribution sections, transformers, and large feeders serving the rest of the building.
OTC installs these systems from the engineered electrical design while coordinating closely with the utility, general contractor, electrical engineer, equipment manufacturer, and other trades.
From Utility Power Into the Building
A commercial electrical service may follow a path such as:
Utility Source → Metering → Service Entrance Equipment → Main Distribution → Transformers / Panels / Equipment
The exact configuration depends on the project.
The service entrance may involve:
-
Utility transformer
-
Underground service conduits
-
Metering equipment
-
Service entrance switchgear
-
Switchboard
-
Main disconnect
-
Distribution sections
-
Main feeders
-
Grounding and bonding
Every downstream electrical system depends on this infrastructure being installed correctly.
Service Entrance Switchgear
Service entrance switchgear can serve as the primary point of electrical protection and distribution for larger commercial buildings.
Depending on the engineered design, it may contain:
-
Main breakers
-
Feeder breakers
-
Metering
-
Distribution sections
-
Protective devices
-
Control equipment
The equipment configuration is selected around the building load, service voltage, available fault current, utility requirements, and engineered distribution design.
OTC installs the equipment according to the approved plans and manufacturer requirements.
Switchboards & Main Distribution
Commercial switchboards may distribute power from the service entrance to:
-
Transformers
-
Distribution panels
-
Mechanical equipment
-
Tenant electrical systems
-
Large equipment
-
Exterior systems
-
Additional buildings
The main distribution should reflect how power needs to move through the finished facility.
A well-planned system also makes future maintenance and expansion easier.
Service Size Starts With the Building Load
The main service should be based on the electrical requirements of the completed building.
Major loads may include:
-
HVAC
-
Lighting
-
Commercial kitchens
-
Warehouse equipment
-
Manufacturing equipment
-
Pumps
-
Motors
-
EV charging
-
Tenant loads
-
Exterior systems
-
Future expansion
For new commercial services and major distribution systems, the service calculations and electrical design are performed by the project electrical engineer.
OTC works from that engineered design and coordinates the field installation required to bring the system online.
Utility Coordination
The utility is a major part of a new commercial electrical service.
Coordination may involve:
-
Service voltage
-
Service point
-
Utility transformer
-
Transformer location
-
Metering requirements
-
Underground conduit
-
Utility pull sections
-
Easements
-
Equipment access
-
Energization requirements
These items should be addressed early because utility requirements can affect the electrical room, site plan, underground routing, equipment procurement, and construction schedule.
Underground Service Infrastructure
Ground-up commercial projects often begin electrically before the building walls exist.
Service infrastructure may include:
-
Utility conduits
-
Service conduits
-
Transformer pathways
-
Pull boxes
-
Equipment pads
-
Grounding infrastructure
-
Large parallel conduit banks
This work needs to be coordinated before concrete, paving, and site improvements make changes difficult.
OTC plans underground routing around both the electrical design and the physical site conditions.
Large Conduit Banks & Parallel Feeders
Larger commercial services can require substantial electrical pathways.
That may include:
-
Multiple parallel conduits
-
Large conductors
-
Parallel feeder sets
-
Long underground runs
-
Large pull boxes
-
Multiple distribution sections
These installations require planning for:
-
Pull lengths
-
Conduit bends
-
Equipment entry
-
Conductor installation
-
Future access
A poorly planned pathway can add significant material and labor cost to an otherwise straightforward distribution system.
Metering
Commercial metering requirements can vary significantly between projects and utility providers.
The electrical service may involve:
-
Utility metering
-
CT metering
-
Meter sections
-
Multiple tenant meters
-
Main building metering
OTC coordinates the physical installation around the approved utility and engineered requirements.
Metering should be resolved early so the service equipment is ordered in the correct configuration.
Transformers & Downstream Distribution
The main service voltage is not always the voltage used by every load in the building.
For example, a facility may receive and distribute power at 480Y/277V while using transformers to provide 208Y/120V for other building loads.
A common distribution path may be:
Service Entrance Switchgear → 480V Distribution → Transformer → 208Y/120V Panel → Branch Circuits
OTC coordinates the switchgear, transformers, feeders, and downstream panels as one complete system.
Electrical Room Layout
Large service equipment requires significant physical space.
Electrical-room planning needs to consider:
-
Equipment dimensions
-
Working clearances
-
Equipment doors
-
Conduit entry
-
Feeder routing
-
Transformer locations
-
Future maintenance
-
Equipment replacement access
The electrical room should be coordinated before the building layout becomes fixed.
Trying to fit large switchgear into a room that was designed too small creates problems that affect the entire project.
Long-Lead Electrical Gear
Service entrance switchgear is often one of the most schedule-sensitive materials on a commercial project.
Major electrical gear may be built specifically for the project and can have substantial manufacturing lead times.
Depending on the equipment and market conditions, lead times can extend for many months, and highly customized equipment can sometimes approach or exceed a year.
That makes early:
-
Engineering
-
Equipment selection
-
Submittals
-
Approval
-
Release for manufacture
critical to the construction schedule.
The electrical room can be finished and the building nearly complete, but permanent power still cannot be energized without the service equipment.
Equipment Submittals & Procurement
Major gear should be reviewed carefully before release.
Important considerations may include:
-
Voltage
-
Amperage
-
Breaker configuration
-
Service rating
-
Fault-current rating
-
Metering
-
Physical dimensions
-
Conduit entry
-
Manufacturer
-
Accessories
-
Future sections or provisions
A mistake in major service equipment can be much more difficult to correct than a mistake on a small panelboard.
OTC coordinates procurement around the approved engineered design and project requirements.
Plan for Future Expansion
When reasonable, the main distribution system should consider how the building may change.
Future requirements may include:
-
Additional tenant loads
-
New equipment
-
Building expansion
-
EV charging
-
Additional HVAC
-
Production growth
That may affect decisions involving:
-
Distribution sections
-
Breaker provisions
-
Electrical-room space
-
Conduit pathways
-
Transformer capacity
The objective is not to unnecessarily oversize the service.
It is to avoid creating a new building with no practical path for future electrical growth.
Grounding & Bonding
The service entrance is also a critical part of the building's grounding and bonding system.
OTC installs the required grounding and bonding components according to the engineered design and applicable requirements.
Depending on the project, that may include:
-
Grounding electrode system
-
Grounding electrode conductors
-
Service bonding
-
Equipment grounding
-
Transformer grounding
-
Distribution grounding
These systems are coordinated as part of the overall electrical installation rather than added as an afterthought.
Testing & Energization
Before permanent power is placed into service, the installed equipment needs to be verified.
Depending on the project requirements, that may include:
-
Visual inspection
-
Connection verification
-
Mechanical checks
-
Insulation-resistance testing where appropriate
-
Breaker testing where required
-
Phase verification
-
Voltage verification
-
Control testing
-
Equipment labeling
Specialized acceptance testing may also be performed by qualified testing agencies when required by the engineer, specifications, manufacturer, or AHJ.
OTC coordinates the installation and field requirements leading up to final energization.
From Utility Transformer to Building Distribution
A complete service entrance and main-distribution scope may include:
-
Utility coordination
-
Underground service conduit
-
Transformer infrastructure
-
Metering
-
Service entrance equipment
-
Switchgear
-
Switchboards
-
Main disconnects
-
Distribution sections
-
Transformers
-
Main feeders
-
Grounding and bonding
-
Equipment testing
-
Utility inspection coordination
-
Final energization
OTC coordinates the electrical construction from the incoming utility infrastructure through the main distribution equipment serving the building.
Building a New Commercial Electrical Service?
Send OTC the electrical plans, one-line diagrams, service requirements, project specifications, and utility information. We can coordinate the underground infrastructure, service entrance equipment, switchgear, metering, main feeders, and downstream distribution required to bring permanent power into the building. The entire electrical system depends on what happens at the service entrance. Build the front end correctly.