Commercial New Build Lighting & Controls
Complete lighting systems coordinated from fixture layout and branch circuits through controls, emergency lighting, exterior lighting, and final operation.
On Target Contracting provides complete lighting and lighting-control installation for new commercial construction throughout the Phoenix metro area.
New-build lighting is more than installing fixtures from a reflected ceiling plan.
The lighting system has to coordinate with the architecture, ceiling layout, emergency requirements, control sequences, daylight zones, exterior systems, electrical distribution, and the way the finished building will actually be used.
OTC coordinates the lighting scope from rough-in through fixture installation, controls, testing, and final turnover.
Lighting Starts With the Plans
Before installation begins, OTC reviews the lighting information provided for the project, including:
-
Lighting plans
-
Reflected ceiling plans
-
Fixture schedules
-
Lighting-control plans
-
Electrical one-lines
-
Architectural plans
-
Emergency-lighting requirements
-
Exterior and site-lighting plans
The goal is to identify conflicts and missing information before rough-in rather than after fixtures arrive onsite.
Interior Commercial Lighting
OTC installs interior lighting systems for spaces such as:
-
Offices
-
Retail
-
Restaurants
-
Warehouses
-
Lobbies
-
Conference rooms
-
Corridors
-
Restrooms
-
Breakrooms
-
Production areas
-
Storage areas
-
Common spaces
Fixture types may include:
-
Recessed fixtures
-
Linear fixtures
-
Decorative lighting
-
Downlights
-
High-bays
-
Track lighting
-
Pendant fixtures
-
Specialty lighting
The installation is coordinated with the ceiling system, architectural layout, and final use of the space.
Lighting Controls
Modern commercial lighting systems frequently use multiple types of controls.
Depending on the project, OTC may install:
-
Occupancy sensors
-
Vacancy sensors
-
0–10V dimming
-
Compatible line-voltage dimming
-
Daylight controls
-
Time clocks
-
Photocells
-
Contactors
-
Zoned switching
-
Lighting-control panels
-
Automated lighting controls
The fixture, driver, and control method all need to be compatible for the system to operate correctly.
Occupancy & Vacancy Sensors
Occupancy-based controls can reduce unnecessary lighting operation in spaces such as:
-
Private offices
-
Conference rooms
-
Restrooms
-
Storage areas
-
Breakrooms
-
Warehouses
-
Utility rooms
Sensor location matters.
Poor placement can result in lights turning off while the space is still occupied or remaining on when the room is empty.
OTC coordinates sensor locations around the actual room layout and intended use.
0–10V Dimming
0–10V dimming is common in modern commercial lighting systems.
The system typically requires both line-voltage power and low-voltage control conductors between the control and compatible lighting equipment.
OTC coordinates the required wiring and verifies that the fixtures and controls are compatible with the specified dimming system.
Daylight Controls
Buildings with significant natural daylight may use daylight-responsive controls near:
-
Windows
-
Storefronts
-
Skylights
-
Open office areas
-
Large exterior glazing
These systems adjust artificial lighting based on available daylight while maintaining the desired light level in the occupied space.
The sensor location, fixture zoning, and control setup all affect how well the finished system performs.
Lighting Zones
A commercial building does not always need every fixture controlled together.
Lighting may be divided into zones based on:
-
Room
-
Department
-
Daylight exposure
-
Aisle
-
Work area
-
Building schedule
-
Exterior area
Proper zoning gives the owner more control over when and where lighting operates.
Emergency & Exit Lighting
New commercial construction may include emergency lighting and exit signage as part of the overall lighting system.
Depending on the engineered design, emergency illumination may be provided through:
-
Battery-backed fixtures
-
Emergency LED drivers
-
Inverter systems
-
Generator-supported circuits
-
Dedicated emergency distribution
OTC installs and tests the electrical system according to the approved project design and applicable AHJ requirements.
Exterior & Site Lighting
New-build lighting can extend beyond the building interior.
OTC can install electrical systems for:
-
Parking lot lighting
-
Pole lights
-
Wall packs
-
Walkway lighting
-
Building-mounted lighting
-
Canopy lighting
-
Sign power
-
Site lighting
Exterior lighting may be controlled through photocells, time clocks, contactors, or other control systems.
Photocells, Time Clocks & Contactors
Exterior lighting frequently uses a control path such as:
Panel → Lighting Circuit → Contactor → Photocell / Time Clock → Fixtures
These components allow larger lighting zones to operate automatically based on time or available daylight.
OTC coordinates the control equipment, branch circuits, and fixture loads so the system operates as intended.
Warehouse & High-Bay Lighting
New warehouse construction requires lighting to be coordinated around:
-
Ceiling height
-
Racking
-
Aisles
-
Production areas
-
Loading areas
-
Work zones
OTC installs high-bay lighting and controls based on the actual layout rather than treating the warehouse as one open room.
Occupancy and zoning controls can also help reduce lighting operation in areas that are not continuously occupied.
Fixture Submittals Matter
Fixtures shown on the plans are not always the fixtures that ultimately arrive onsite.
Product substitutions can affect:
-
Voltage
-
Driver type
-
Dimming compatibility
-
Mounting
-
Emergency capability
-
Control requirements
OTC reviews available approved fixture information before final installation so changes are identified before they create field problems.
Owner-Supplied & Decorative Fixtures
Some projects include lighting supplied by the owner, architect, or specialty vendor.
Before installation, OTC reviews available information for:
-
Voltage
-
Mounting
-
Driver requirements
-
Dimming
-
Control compatibility
-
Connection requirements
Decorative fixtures still need to work electrically with the system serving them.
Coordinate Before the Ceiling Closes
Lighting rough-in often has to coordinate with:
-
HVAC
-
Fire sprinklers
-
Fire alarm
-
Low-voltage systems
-
Ceiling grid
-
Structural elements
-
Architectural features
Resolving those conflicts before the ceiling closes helps avoid relocation, rework, and damaged finishes.
Final Testing & Control Verification
A lighting system is not complete simply because every fixture turns on.
Before turnover, OTC verifies the applicable portions of the system, including:
-
Fixture operation
-
Switching
-
Occupancy controls
-
Dimming
-
Daylight controls
-
Time clocks
-
Photocells
-
Contactors
-
Emergency operation
-
Exterior lighting
The purpose is to confirm that the installed lighting behaves the way the completed building is intended to operate.
Planning Lighting for a New Commercial Building?
Send OTC the electrical plans, reflected ceiling plans, fixture schedule, lighting-control information, and project specifications. We can coordinate the lighting circuits, fixtures, controls, emergency systems, and exterior lighting from rough-in through final testing. Install the lighting system once—and make sure the fixtures, controls, and building all work together.